YILPORT Gävle: Doubling the Train Capacity at the Container Terminal
YILPORT Gävle together with Port of Gävle is doubling the railway capacity on the container terminal due to reaching the limit and to meet future demands. The project started in early September and is set to be completed in Q4 2023. The container terminal will then be equipped with four railway tracks leading into the terminal area. The railway currently consists of two 300-meter-long tracks. With the additional two tracks, the railway will reach a total of 1200 meters divided on four tracks.
By doubling the number of tracks at the container terminal, YILPORT Gävle is taking a step forward in enhancing the operational capacity. This investment is aimed at improving efficiency, reducing congestion, and providing even better service. Stay tuned for more updates on this ongoing project.